Skip to main content
solar
Installation of solar panels

HIPRA opts for the use of environmentally friendly energies. Following this approach, the company has carried out a photovoltaic solar installation for self-consumption at the Headquarters (Spain), with a total power of 692.22 kWp, an investment of €643,283.24, and a subsidy of €69,095.25. Another installation has been carried out at the Lloret Salvatge centre (Spain), with a total power of 518.10 kWp, an investment of €426,210.43, and a subsidy of €46,881.87. 

Additionally, at the Campus Aiguaviva (Spain), with a total power of 533.4 kWp, an investment of €414,985.20, and a subsidy of €69,647.98. 

This project is part of the incentive program for self-consumption and storage with renewable energy sources, as well as the implementation of renewable thermal systems in the residential sector, within the framework of the Recovery, Transformation, and Resilience Plan, funded by the European Union - NextGenerationEU.

 

photovoltaic
Report over 100 kW Headquarters
PDF
Report over 100 kW Lloret Salvatge
PDF
Report over 100 kW Campus HIPRA
PDF